A Little OT: Building a Deck

Posts

A Little OT: Building a Deck

#1

A Little OT: Building a Deck

tom rex

My son wants to help me build a deck for him.

His back yard slopes a lot both directions.

We are going to put concrete in sleeves and put the uprights (don�t know what they are called) in the concrete.

The length of the deck will be about 20 feet across the back of the house and 10 feet out from the house.

We cannot tie the deck to the house.

How do I get the floor joists level?

What is the best tool to use for this?

Many years ago I saw a guy use a water hose with glass bubbles on both ends to level siding he was putting on his house.

Is that a good method?

Where can I buy the glass bubbles?

What are they called?

Are there any good videos available on basics of building a deck?

Lot of questions!

Thanks for reading and a special thank you for any help,

T Rex

Re: A Little OT: Building a Deck

#2

Random thoughts *LINK*

Bill Houghton, Sebastopol, CA

I bet your local library has a video or two and a book or two on deckbuilding. Decks, like almost anything else, are basically simple structures that can be built wrong in thousands of ways.

When you say your son's lot "slopes a lot," does this mean steeply? If so, research your deck construction carefully, and overbuild. Last summer, out at the river in this area, a deck collapsed on a rental unit, with lots of people injured badly. Fingers were being pointed all over the place - the kids who rented it claimed they were just vacationing there and ignored the prohibition on partying, the owners claimed they'd been explicit about limiting the number of people in the property, and so on and so on. But the fact is, the deck was underbuilt and, probably, under-maintained.

Check your son's jurisdiction as to whether he's supposed to pull a permit for this deck. If he is and doesn't, and there's an accident, his homeowner's insurance may not want to pay.

Look for "water level" for the hose with clear tubing. I owned one for a while that I'd picked up at a big box store. The link below describes making one from tubing (note: I haven't tried what this link recommends, and googling "water level" got me 63 million responses, so there's lots of information out there). I personally found it frustrating - as you changed one end, the other end changed, too, as the water found equilibrium, and using it meant a lot of fossicking about to get both ends aligned right.

You might check with local rental yards to see if they have professional-grade laser levels available. You wouldn't want to buy one - $300 and more - just for this job, and if you organize your work right, you might be able to get it all leveled in one long day.

For inside work, to wander off topic, there are pretty decent laser levels available for about $70, which will pay for themselves on the first remodel; but they're not bright enough for outside use.

Level is just one issue, though - your posts need to be in line both ways so your framing is properly supported and the edges of the deck finish off well, for which you will definitely need lines (mason's lines) and may need a builder's transit (also available from your rental yard).

I do not recommend putting the posts in the concrete. Everything always needs repair, and if you sink the posts in the concrete and put a deck on top, you've made it very difficult to repair; To replace it, you would have to lift the post out and lower the new one in, hard to do with a deck on top. Plus, unless the pressure treating is perfect, you're probably increasing the likelihood of decay. Instead, use one of the post anchors your lumberyard can supply for each post, and use your lines or transit to align the anchors. If the yard slopes a lot, this can get challenging. With the post anchors, if a post develops rot, you can remove the fasteners (nails or bolts - bolts are better) at the post anchor, cut it loose from the deck framing, and put in a new one.

If you find the idea of aligning the post anchors precisely during the pour too intimidating, you can get post anchors that you bolt to the pad (the concrete). These have slightly oversized holes, and you can "spin" them on the anchor bolts to align them, so you can make small adjustments as you frame, before cranking down on the anchor nuts.

Also consider your soil, and size your post pads accordingly, both in footprint and in depth (if you're in frost country, of course, you have to dig down below frostline, but even if you're not, you need to dig deep enough to have good anchoring that won't be undercut by erosion).

You'll wind up pouring your post pads at a reasonable height above the ground (8" is minimum, 10" better - soil buildup is inevitable), then cutting your posts to length. Getting the two end posts for each joist right, installing the joist level on top of (temporarily plumb-braced) posts, then cutting the intermediate posts to length, is not a bad approach, IF your joists are straight enough. If there's any sag, you may need a different approach. There are lots of post-to-joist metal anchor designs out there. Remember to apply rot-preventive treatment to any cuts in your posts.

If you can't fasten to the house and the deck is very high off the ground, you're going to need to pay a lot of attention to cross-bracing. Tying to the house is the best solution (if done well - doing it badly will lead to rotted framing on the house and more trouble than there's room to describe - my carpenter son has told me some real horror stories). X-bracing, running 2x4 or 2x6 boards from the top of one post to the bottom of an adjacent post, in both directions, is the commonest solution. Do NOT rely on metal strapping for this, because it's useful only in tension; timber works in tension and compression both. Size your fasteners appropriately; lag screws would be better than nails, and they should be galvanized (especially in treated lumber, which, these days, will corrode steel pretty fast).

The deck railing is important too; plan it as part of your design before you break ground. Properly, you should integrate the railing with the framing in a way that ensures a sturdy railing; again, you don't want your son explaining to his homeowner's insurance company that the railing failure wasn't his fault. Don't plant the railing on top of the deck and rely on nails to keep it from breaking loose when a guest leans against it.

Also, even if there's no permit requirement, build the railing to code as to height and maximum opening permitted, to keep kids safe. These horizontal cable railings that are so popular now make me shudder; I always picture our older son, as a two-year-old, going up them in 10 seconds and over the edge (we spent a lot of time in his childhood chasing him as he headed for certain disaster).


One approach

Re: A Little OT: Building a Deck

#3

Re: Random thoughts

Lee Schierer McKean, PA

I can only add that you should consult an engineer on the final design of the supports for your deck and railings. Far too many decks are poorly supported. Many people use 4 x 4 posts when they should be using 4 x 6 or even 6 x 6 posts to support the load at the height of their deck. It is difficult to over support a deck ,but relatively easy to under support one where it become dangerous. Improper railing height and design is another area where you can get into trouble. Many of the railings sold at the BORGs don't meet code.

Lee

Re: A Little OT: Building a Deck

#4

Re: Random thoughts

Barry Irby

Bill and Lee have given you good advice.

I suggest you go to websites perhaps like HGTV and many others to find videos on building a deck. YouTube probably has some as well. Remember that YouTube is not censored or reviewed and just because a video is there does not make it authoritative. The Borgs have books on this as well. Your local Code people may be helpful if you ask.

Building a deck on a sloping lot, especially a steep lot, is not an easy project for the inexperienced. There is nothing easy about a really steep lot. I Used to build on some that sloped nearly 45 degrees. Just getting the layout correct was not easy. We sometime put up what masons around here call batter boards. (Stakes and a frame at each corner to give us a level surface to work from.) Some of them were so steep we had to use ladders to get high enough to drive the stakes. Beyond that, carrying the lumber into place was a chore. Hope yours is not that steep. If it is, I would suggest you leave it to the pros.

Check your local lumber yards (Not the Borgs) and see if you can find treated lumber (if you are using treated lumber) that has been dried after being treated. (KDAT= Kiln Dried After Treatment or ADAT= Air Dried After Treatment) If you can find it, it is significantly more pleasant to work with. Substantially lighter in weight and it is much less likely to warp or at least, it will have warped as it dried and you can leave those pieces in the lumber yard.

For many years, every one treated decks as an after thought. Something that was slapped onto the house at the last minute. The Codes people hardly gave them a glance. Now all you have to do is Google "deck collapse" and you will see that they fall down by the hundreds. Thus, the codes people have tightened up. Or at least they should have. And you should too. Do not rely on nails. Think of nails, even galvanized ones as temporary fasteners. Go to screws and bolts. Be absolutely sure to buy the ones rated for the treated wood. ACQ lumber took over from the old CCA. It is five times as corrosive to steel. There is newer stuff treated with borates and it is not as corrosive, but you should still use excellent fasteners. You really should not rely on the bolts any more than you must. Have the beams that support the joists bear directly on the posts, not be bolted onto the sides of them. Have joists sit or bear on top of the beams, not be hung from them. There is nothing wrong with the engineered hangers, but why rely on them if you don't have to?

Re: A Little OT: Building a Deck

#5

Pier Blocks

Ed Beck

Post anchors may also be know as pier blocks. I like using these because the post attachment is loose in the concrete. It has a bolt on the part that goes into the concrete for leveling.

http://www.mutualmaterials.com/Homeowner_product.asp?pt_id=85&p_id=172

Re: A Little OT: Building a Deck

#6

Re: A Little OT: Building a Deck

Terry in Edmonton

Check the building codes in your area. You are usually required to tie the deck to the house with at least a 2X6 rim joist.

Re: A Little OT: Building a Deck

#7

Re: Pier Blocks

Bill Houghton, Sebastopol, CA

Ed,

I hope you won't take this as an attack on you for your suggestion; and I'm certainly NOT an expert.

I've never quite understood pier blocks in other than light duty and temporary construction. They're not tall enough to provide good "setting" in the ground, and often not large enough to provide good footing for load spreading. At one time, here in California, they were accepted as something you could drop on top of concrete poured into a posthole dug down to footing depth. But this is kind of silly, because the bonding between a pier block and wet concrete would be minimal, and, at least with the pier blocks I see out here, there's no steel sticking out of the bottom of the block to tie into wet concrete.

Fine, perhaps, for a shed or other small structure for which serious load bearing isn't an issue - I've got them under a couple of sheds in my backyard. But for the proposed deck, which sounds to be of some height from the ground, I don't see how they'd work out adequately, in either load bearing or ground shear (if that's the right term).

Re: A Little OT: Building a Deck

#8

And, if you are,

Bill Houghton, Sebastopol, CA

be sure that you've flashed your connection to the house properly, and provided drainage between the ledger tied to the house to support the deck and the house siding/sheathing/framing. There are clever little spacer washers available now, probably even at the Borgs like Home Despot or Lowe's; when I did our porch, I couldn't find any, and had to resort to stacked galvanized washers, which gave me 1/8" or 1/4" of clearance (I cannot now remember how many washers I used per connector).

I'm noticing two themes in the responses here:

1. Calculate your loads well and overbuild if in doubt.

2. Do your research.

If you don't find the supplies you need at the big box stores, track down the local contractor's lumberyard (if you're lucky enough to have one in your area). The one in this area has been friendly toward homeowners for some years, although they do expect said homeowners to have at least basic knowledge; the serious slowdown in building has led them to redouble their outreach to homeowners, many of whom are doing as much remodeling as ever (in some cases more, because they're unable to or deciding not to move up to another house). The quality of the advice and help I get there is much better than from the big box stores.

Re: A Little OT: Building a Deck

#9

Re: A Little OT: Building a Deck

Bill Turpin in WNC mountains

BUILD TO CODE! Pier blocks do not meet code here. Balusters must be 4" or less apart so that a kid can't get their heads stuck. They will shrink at least a 1/4" after installation. A few more of them added for 3.5" spacing will prevent having to add way more after they ALL will not meet code. My 28" deep concrete post holes are now ten inches out of the ground after 25 years on a gentle slope. Support the joist's ends with another timber supported by the end plate.

Re: A Little OT: Building a Deck

#10

One additional thought

Bill Houghton, Sebastopol, CA

although I reserve the right to babble on...

I would say, build to code AT LEAST. No harm in exceeding code, other than (sometimes slight) additional expense, and thoughtful construction, especially good flashing details, will add a lot of life to the deck.

Although my dad once got in trouble for exceeding code with a building inspector on the house addition that occupied many of his weekends from the time I was five until my teen years; it escalated to a conversation with his boss, and that particular inspector never came out to the house again. By now, no doubt, what he did beyond code has long been superseded by newer code; I know there were some elements to his construction that would give modern inspectors the vapors.

Re: A Little OT: Building a Deck

#11

Re: A Little OT: Building a Deck

FredD

Tom,

your deck is a relatively straight forward project that you should be able to do if you may attention to each stage of the process.

To answer some of your questions , ,yes a water level in this case would serve you best, put a little red food dye in the water to improve visibility of the water level. Fasten one end to a point that is the height of your Sono tubes and leave it there and move the other end around as you need to. A water level is accurate to within a 1/8th inch which is good enough for deck building.

Most Hardware's and all Concrete supply houses carry it.

You can also rent a Builders Level which is a adjustable scope on a tripod and takes some getting used to , in this case I would go the water level route. I own a Transit and a Builders level and would not rent one because of the rough treatment some get and are therefore out of adjustment .

The size of your deck lets you get by with two rows of piers with three piers in each row.

One pier set in about six inches at each corner and one in the middle row parallel to the house .

This spacing lets you use a 4x10 at the house end and at the outside end to carry your joists, which depending on spacing could be as small as a 2x6 ,set 16 "O.C.

Be sure to run a row of blocks at each end of the joists over the 4x10 to keep the joists from twisting.

To start the job , Barry's idea about batter boards works fine for this project, set up a ell shaped form on stakes at each of the two end corners outside of the work area , use them for height and distance references from the house.

Establish the two outside end corners by extending the house foundation line with a string pulled along about six feet of the foundation wall and out to the batter board and tied off. The batter board attached to the stakes is a 1x6 or 2x6 as a rule .

I would drill the pier holes inside of that string about 12 inches and about six inches from the house . This give you a small cantilever for the deck to extend over the 4x 10 and looks better. Also the 4x10 will extend over the pier at it's ends a little.

Your choice of decking material is fairly wide, for myself , I have always thought 2x4 looked better then wider stock, takes a little longer to lay, but if you glue down the deck with PL500 , your not going to set any records time wise anyhow.

About the glue , it allows the decking to show no fasteners which promote dry rot regardless of whether they are nails or screws and looks much better

Because your using Sono tube poured piers, sheer bracing is not required and the deck looks better without it.

If your in California , you definitely need to check in your Bldg. Dept. and get a permit and naturally they will want at least a sketch of the project before you start. They haven't allowed decks to be fastened to the house for thirty years and because of continual upgrading of Earthquake standards the requirements change nearly yearly.

The railing is a whole separate job and needs to be preplanned for the best way to secure it to the deck.

Depending on the grade of your lot and required clearance from the ground , this plan is only a typical one that fits most cases , but not all.

You will need one good strong helper , if the job seems daunting hire a Carpenter to help you.

Good luck

FredD