Random thoughts *LINK*
Bill Houghton, Sebastopol, CA
I bet your local library has a video or two and a book or two on deckbuilding. Decks, like almost anything else, are basically simple structures that can be built wrong in thousands of ways.
When you say your son's lot "slopes a lot," does this mean steeply? If so, research your deck construction carefully, and overbuild. Last summer, out at the river in this area, a deck collapsed on a rental unit, with lots of people injured badly. Fingers were being pointed all over the place - the kids who rented it claimed they were just vacationing there and ignored the prohibition on partying, the owners claimed they'd been explicit about limiting the number of people in the property, and so on and so on. But the fact is, the deck was underbuilt and, probably, under-maintained.
Check your son's jurisdiction as to whether he's supposed to pull a permit for this deck. If he is and doesn't, and there's an accident, his homeowner's insurance may not want to pay.
Look for "water level" for the hose with clear tubing. I owned one for a while that I'd picked up at a big box store. The link below describes making one from tubing (note: I haven't tried what this link recommends, and googling "water level" got me 63 million responses, so there's lots of information out there). I personally found it frustrating - as you changed one end, the other end changed, too, as the water found equilibrium, and using it meant a lot of fossicking about to get both ends aligned right.
You might check with local rental yards to see if they have professional-grade laser levels available. You wouldn't want to buy one - $300 and more - just for this job, and if you organize your work right, you might be able to get it all leveled in one long day.
For inside work, to wander off topic, there are pretty decent laser levels available for about $70, which will pay for themselves on the first remodel; but they're not bright enough for outside use.
Level is just one issue, though - your posts need to be in line both ways so your framing is properly supported and the edges of the deck finish off well, for which you will definitely need lines (mason's lines) and may need a builder's transit (also available from your rental yard).
I do not recommend putting the posts in the concrete. Everything always needs repair, and if you sink the posts in the concrete and put a deck on top, you've made it very difficult to repair; To replace it, you would have to lift the post out and lower the new one in, hard to do with a deck on top. Plus, unless the pressure treating is perfect, you're probably increasing the likelihood of decay. Instead, use one of the post anchors your lumberyard can supply for each post, and use your lines or transit to align the anchors. If the yard slopes a lot, this can get challenging. With the post anchors, if a post develops rot, you can remove the fasteners (nails or bolts - bolts are better) at the post anchor, cut it loose from the deck framing, and put in a new one.
If you find the idea of aligning the post anchors precisely during the pour too intimidating, you can get post anchors that you bolt to the pad (the concrete). These have slightly oversized holes, and you can "spin" them on the anchor bolts to align them, so you can make small adjustments as you frame, before cranking down on the anchor nuts.
Also consider your soil, and size your post pads accordingly, both in footprint and in depth (if you're in frost country, of course, you have to dig down below frostline, but even if you're not, you need to dig deep enough to have good anchoring that won't be undercut by erosion).
You'll wind up pouring your post pads at a reasonable height above the ground (8" is minimum, 10" better - soil buildup is inevitable), then cutting your posts to length. Getting the two end posts for each joist right, installing the joist level on top of (temporarily plumb-braced) posts, then cutting the intermediate posts to length, is not a bad approach, IF your joists are straight enough. If there's any sag, you may need a different approach. There are lots of post-to-joist metal anchor designs out there. Remember to apply rot-preventive treatment to any cuts in your posts.
If you can't fasten to the house and the deck is very high off the ground, you're going to need to pay a lot of attention to cross-bracing. Tying to the house is the best solution (if done well - doing it badly will lead to rotted framing on the house and more trouble than there's room to describe - my carpenter son has told me some real horror stories). X-bracing, running 2x4 or 2x6 boards from the top of one post to the bottom of an adjacent post, in both directions, is the commonest solution. Do NOT rely on metal strapping for this, because it's useful only in tension; timber works in tension and compression both. Size your fasteners appropriately; lag screws would be better than nails, and they should be galvanized (especially in treated lumber, which, these days, will corrode steel pretty fast).
The deck railing is important too; plan it as part of your design before you break ground. Properly, you should integrate the railing with the framing in a way that ensures a sturdy railing; again, you don't want your son explaining to his homeowner's insurance company that the railing failure wasn't his fault. Don't plant the railing on top of the deck and rely on nails to keep it from breaking loose when a guest leans against it.
Also, even if there's no permit requirement, build the railing to code as to height and maximum opening permitted, to keep kids safe. These horizontal cable railings that are so popular now make me shudder; I always picture our older son, as a two-year-old, going up them in 10 seconds and over the edge (we spent a lot of time in his childhood chasing him as he headed for certain disaster).
One approach