Finally building a shop- I contracted for foundation wall and slab, but will be framing myself with some help. Laying out the sill plates, I find that the diagonals are off by 6" (building is 24' x 40').
That seems pretty huge to me- I can work with it, and get the 2x6 walls square and on the foundation, but I'm wondering- is that in the realm of reasonable? Or is 6" as bad as I'd think it is?
A 6" difference in the diagonals equates to 3" out of square.I personally would not accept that as a standard for a building I am constructing.I think I would have my foundation contractor out on site re-laying new block,presuming it will still land on the poured footings.
Your contractor should have strung lines for reference and could have easily checked for squareness at that time.
I have been in houses that started out out of square and the problems just seem to magnify with each new phase.
As hard as money is to come by,and my assumption that this will become your dream shop I'd try to do everything as best as could possibly be done.
Fix it while you have the opportunity. It'll haunt you till you die if you don't. Any reputable contractor would welcome the opportunity to get rid of that kind of evidence of shoddy work.
For contracted work that IS un-acceptable. If I had poured/laid it myself I MIGHT be of a mind to make it work (probably not though). If you let it slide you're going to have heart ache at every turn while building. From frameing to painting you'll wind up second guessing what the heck is going on. Above all, you paid someone big money for a profesional job . . . and didn't get it. No matter the amount of erorr.
Scott, My question would be, who layed out the footing and put the corner pins in for the foundation walls? If it was the foundation contractor, he should make good for it by either fixing it or giving a huge price break. If you are pouring the slab before you frame you could adjust it there. George
You should correct the error. There will be HECK to pay when you get to the roof. If you are using trusses and plywood roof sheeting it will be a bear to straighten it out. If everthing is square, plywood roof sheeting goes on like a dream. 6" out of sqaure will be a nightmare.
Have you checked it for level? If they laid it up 6" out of square wonder how far off level they were? More than about an inch out will be nightmare the second edition.
I agree with all the other guys. I have done a lot of remodel work so I am familiar with out of square. It will eat up a lot of time and money and cause a lot of foul language.
If you can end up with a square framework, fall on the foundation, and end up with a 24' x 40 building, then the contractor has his part. Finish carpenters, kitchen, window or door installers deal with out of square, level or plumb conditions all the time. If we relied on the person before us doing a perfect job we would starve.
Six inches is not a lot. You can split the difference with your sill plate , split it again with a drip edge, split again with whatever your outside finish and by the time you are landscape it will be invisible.
Worse actually, this will pop up and bite you when you roll the Trusses or stack the rafters and go to the sheathing.
It sounds like the slab is in, if this is the case , get a hold of a Concrete Contractor who is familiar with a "shadow wall " to bring the slab back close to square.
This is a tapered concrete addition to the outside of which ever long wall needs to be adjusted.
What you are shooting for and is absolutely necessary for the rest of the building to be easy to assemble is keeping the two long walls (the ones that carry the roof) as close to parallel as possible.
If the walls are not parallel , the trusses will not fit , regardless of what you may have been told.
You may find that the end walls are not parallel which is not a hassle as long as you know it. But one end wall will be a ninety to the side walls and would be where you start to deck the roof with whatever you choose for sheathing.
Since the guy that did the slab thought he was right on , this means more then likely that he is not capable of fixing it, but should get to pay who you get to do it over.
This a legitimate back charge , you paid once , that all that is expected of you.
Fred is right on thsi as usual. You need to know what is wrong with this foundation to know how to proceed. You need to measure the slab/foundation to see how it got to be off.
The usual procedure is to make sure to two long walls are the same length and the two short walls are the same. Then, the assumption is that if the two diagonals are the same, the building is "square". (Acutally the building would be a rectangle, but the corners would be "square" or ninety degree angles.) This requies one other assumption. That it is also level or at least lying in a plane. If it is not a plane or level depending on how far out it is, the "matching dimensions and diagonals" won't assure you of "square".
If your sides and ends have nicely matching lengths, but the diagonals don't match you probably have a rhombus, with two acute angles and two obtuse angles, but the sides and ends would be paralel to each other.
If the lengths of the sides and ends don't match, all bets are off. You could have any four sided polygon with any set of angles and nothing will fit right. You may be able to fudge your way through, but why fight it every step of the way? Fight it now and move on with a reasonably square building.
When I was building I used 1/10000 as my standard, particularly on buildings involving steel fabrication. On a building your size I would have been looking for dimentions off less than 1/8" on the foundation. You probably will be OK if you get them all within 1/2" (cringe) of each other. My first boss was an Engineer. He took a lot of time on foudnations. Said "You can't finish right if you don't start right."