Re: OT Septic drainfield question
Kneale Brownson..Packing for return to CO snows
>I used to install septic systems.
I've never heard of a drainfield plan using piping that size.
Your local county government, and possibly your state, set requirements for your drainfield components. They issue permits locally and inspect the drainfield before it's covered. Normally, your locally permitting agency (could be the county health department or the construction code office or a plumbing permit office) would have a record of the permit for your drainfield that would include a plan with component specifications.
Normal septic system service is just pumping out the tank(s). Most modern tanks have two chambers with two covers for inspeting and cleaning. A good system for a high-usage circumstance would have two double tanks. The multiple settling chambers is to keep anything other than liquid out of the drainfield. There should be no need to "vacuum out" the drainfield itself.