Rebuilding a deck a few questions

Posts

Rebuilding a deck a few questions

#1

Rebuilding a deck a few questions

Dustmaker Mike

>I have been home for the last week and my LOML has informed me the back deck is falling apart. She really didn't have to tell me I noticed it all by myself. So after catching up on the it is broke list fix it now. I have to rebuild the back deck. I am planing on using 2x6 treated for the deck the joist are in good so I am not replacing them. I have an account at the Blue Borg so that is where the lumber is coming from. I noticed it is a green color from the treating I guess. So here is my question. How long do I have to wait until I put a protective finish on it? Also I was planing on screwing it down instead of nailing it. Pros and Cons of screws to nails? I am taking it down today and buying material tomorrow or Sunday. Thanks

Re: Rebuilding a deck a few questions

#2

Re: Rebuilding a deck a few questions

Pete in Holland, MI

>If the boards are very wet when you screw them down, you can pull the screw heads about a quarter or 1/2" into the wood when driving and the hole kinda seals up afterwards. That's the way I always built mine. If your wood has been re-dried after treating, then you'll have to use standard practices.

Use an electric drill for driving screws. This is a lot of work and miles on a cordless drill.

They say you have to wait upwards of a year to do any finishing on treated lumber. Would suggest you wait at least until Fall till you do any treating.

Make sure to space your boards with a nail as a gauge. Tight board will expand in a long rain. They also will retard drying and are more likely to retain dirt in the cracks....also retarding drying.

Good luck !

Re: Rebuilding a deck a few questions

#3

Re: Rebuilding a deck a few questions

Bill Howatt

>I always use screws for virtually everything. I do use a cordless drill for driving them but if you really want to penetrate the wood as Pete says then a corded is better.

I don't believe in the wait a year because it is treated but I do believe in wait until the wood is reasonably dry before adding a finish. After all, what oil-based product wants to stick to water; if it is latex then it isn't so critical. OTOH, putting a finish on the traffic area of a deck that will hold-up is more challenging than on a non-traffic surface.

What you really have be careful of these days is to use fasteners that are approved for the newer treated lumber. It is a lot more corrosive than the old treated lumber. I believe stainless, hot-dipped galvanized or special-coated screws are the best and I think in that order.

Bill

Re: Rebuilding a deck a few questions

#4

Re: Deck

Mark Mandell - Gone Round In Jersey

>Several issues

1. Borg lumber: You'll be lucky if you get US No. 2 grade there; fine for joists, not so hot for the decking. Suggest that you use 4" stock rather than 6" if your deck gets direct sun; reduces cupping greatly (reminder: "bark-side-up"). Suggest you do a bit of comparison shopping for your wood. You're likely to find the stock from a quality yard to be much better than the Borg, blue or orange, and worth the price difference.

2. Fasteners: I use nothing but square-drive 302 stainless screws in wood decking; I know that ACQ will not eat stainless whereas the other options are a function of time before the coating breaks down. For top fastening I use 2 cordless tools; a 14v drill set up to predrill and countersink the holes, and an 18v impact driver to run the screws in to that set depth. Countersinking the screws keeps the heads clean in the wood so that if you have to remove a board later, you won't tear up the wood surface backing out the screws. If your structure will allow it, look into the hidden fastener systems that hold the deck boards from below. They make a nicely finished job. Look up McFeeley's website for more information.

3. Finishes: Every new install of treated wood I do gets soaked with Flood's Seasonite. It conditions the wood and controls drying to an even rate to prevent most checking and feathering during the first year when your wood is drying and becoming set to the shape. I then apply my deck finish the following year.

Hope this helps

Re: Rebuilding a deck a few questions

#5

My experience.....

Tim Greif - West of Chicago

>When I built my deck, the pressure treated stuff was pretty damp. And this was the old CCA treated wood, but I would expect that the wood available today is still pretty wet with the treatment chemicals. If the wood is still damp, do not provide a gap between the boards. As they dry naturally, they will create their own gaps.

I bought a corded Ryobi drywall gun specifically for the screws to fasten the deck boards. I figured if it was the only time I ever used it, it was just part of the cost of materials. Get the stainless screws for the new ACQ treated lumber. I also did the same thing as Mark mentioned - predrilling each hole with a Makita cordless drill. It doesn't really add that much time and lessens the effort needed to pull the board down against the joist.

I use a Wolman product called "RainCoat". It comes clear or with a couple tints. I use the cedar tint. It actually waterproofs and water actually beads on the deck, which some find less than desirable, since it takes longer to dry after a rain. But I like it. I let the deck weather until the year after installation to apply it the first time. Every three or four years, I power wash the horizontal deck boards and reapply.

It's been 19 years and I have yet to need to replace a board. Still looks very good. Good luck.

Re: Rebuilding a deck a few questions

#6

PS - Finish

Mark Mandell - Gone Round In Jersey

>Once the wood is seasoned and stabilized, I highly recommend Penofin Oil finishes. Best is their red label with 99% UV blocking in a transparent finish, but the blue label also does quite well. These are penetrating oil finishes so there's no film to peel or chip. Figure 2 years on horizontal surfaces, 4 on vertical.

Re: Rebuilding a deck a few questions

#7

What I think I know......

Barry Irby

>I have built many decks as a builder and then repaired a few.

I agree that the stainless screws are best, but the ones rated for ACQ lumber are also suitable.

The lumber will be wet. Only use a small space space between the boards. They will shrink as they dry and will never swell as large as they are again.

My understanding is that the finishes will provide very little protection against decay. You will be treating the top side only. Water will find its way into the lumber from below and the finish may well retard drying. In any event, I would let it dry for a a few months before staining anything.

As for the size of the boards, I wonder about the wisdom of using 2x4's. I find they are cut from very small trees and often mostly juvenile wood. Such wood is seriously prone to warp and may even rot more quickly. I always used 2x6's or even 2x8's. I find they come form much larger more mature trees and are far less inclined to warp. Try to put the bark side up.

I also find that putting a single screw at each joist is enough. I alternate them back and forth. I find they have much less tendency to split the top of the joists that way. If the planks are going to warp, the fasteners won't hold them. If I get a slightly warped one, I try to screw it down later. If I get a wild one, I replace it later.

Fine Home Building ran an article recently on fastening deck boards in May 2009. I read it in the blah blah mode, but the best thing I got out of it was the idea of flashing the top of each joist. They suggested using a strip of waterproof material on top of each joist to help keep it dry. Could be a strip of 30 lb felt or some of the new tapes like vicor or zip tape. I'm willing to bet that is a really good idea. Try Checking out the article on Taunton Press.

Re: Rebuilding a deck a few questions

#8

2x

Mark Mandell - Gone Round In Jersey

>Been using 2x4 KD No. 1 for many years without a hitch. Course I put 2 screws through each board into each joist. 1 screw in a 2x8? Not me, but YMMV. Attached is 16 years old.


img

Re: Rebuilding a deck a few questions

#9

Extension- 1 Year 

Mark Mandell - Gone Round In Jersey

>


img

Re: Rebuilding a deck a few questions

#10

Re: Rebuilding a deck a few questions

Fred Davis

>I lost count of the deck jobs over the years , but after a association with Bob Morris , I changed my way of doing it.

Bob was associated for years with Frank Lloyd Wright and was the most talented Landscape architect I ever knew.

He told me if wanted his deck work , I would do it his way and that way turned out to be a winner.

He also said ,"if you want your deck to look like Rosie the Riveter installed it , nail or screw it down.

He did not allow fasteners to show and left that to me .

I glued the deck boards. (generally 2x4 Redwood , A or B one face with PL 500 construction adhesive, which I held in place with a few scattered toe nails using a Senco wide crown staple gun until the glue set

When the Redwood was wet we pulled the boards tight and they developed gaps as wide as 1/4" in a few weeks in the California sun.

If it was KD we used the blade of our combination squares to space the boards.

We tried for KD most of time , unless we could span the deck with a single board length , because of the end shrinkage in Redwood is more then nearly any domestic wood.

You get better lumber in a lumber yard, then any other place.

Barry's note on flashing the top of the joists is worth doing.

A caution about screws sunk below the deck level , that forms a hole that collects water and eventually becomes a problem .

With your shedule , I don't evny your task , good luck.

FredD

Re: Rebuilding a deck a few questions

#11

Thanks All

Dustmaker Mike

>I started taken apart the deck yesterday. I am rethinking the 2x6 idea. I have to inspect each joist for rot. If I find a few that have rotted or are weak I will replace all of them. I hope by the end of this weekend I will be done with demo and have the frame up. Next weekend I want to sit on it and watch the fireworks. It will not have a rail system on it but I hope to have the deck done.