Re: Paying for leftover supplies?
Neal in San Jose
>If this is a business, you need to treat it as such. If it is a hobby, well the rules are a lot more relaxed. When I was contracting full time, I didn't worry about leftovers, as I usually used some leftovers (consumables like sandpaper, thinner, etc.) from prior jobs on the current jobs, and just figured it came out about even. In my bid was a line item (usually 10%, depending on how comfortable I was about being able to identify everything needed for the job) for overhead and contingencies and was explained to the customer before the job started. It covered such things as consumables, tools, truck repair, my health insurance, etc. If I had priced or purchased something major incorrectly, I always refunded it if it was in the client's favor, and ate it if it wasn't. I'd leave things like the remaining special order paint, etc. with the client at the end of the job, but not the thinner or half box of nails.
Were there things that you used up, wore out, or otherwise benefitted the client that you didn't directly charge for? Did you drive to their residence putting miles on your vehicle and using gas? Did you drill a hole and dull, however slightly, the bit? Did you use your electricity to power the drill?
It really comes down to how fine you want to slice it. Are you really going to remember to charge the next client for a cup of thinner?