OT Plumbing
Mark Mandell - Gone Round In Jersey
>P/N 4314 PIPING SPECIFICATIONS
1. All pipe is to be made of a long hole, surrounded by metal evenly centered around the hole.
2. All pipe is to be hollow throughout the entire length.
3. All pipe is to be of the very best quality, perfectly tubular or pipular.
4. All acid-proof pipe is to be made of acid-proof material.
5. O.D. of all pipe must exceed the I.D. otherwise the hole will be on the outside causing leaks.
6. All pipe is to be supplied with nothing in the hole so that water, steam, or other stuff can be put inside at a later date.
7. All pipe is to be supplied without rust, as this can more readily be applied at the jobsite.
8. All pipe is to cleaned free of any covering such as mud, tar, barnacles, or any form of manure before putting up, otherwise it will make lumps under the paint.
9. All pipe over 500 feet long must have the words �long pipe� clearly painted on each end so the fitter will know that it is a long pipe.
10. Pipe over 2 miles long must also have the words �long pipe� painted at 500 foot intervals so that the fitter will not have to walk more than that to determine if it is a long pipe or not.
11. All pipe over six inches in diameter is to have the words �large pipe� painted on it so that the fitter will not use it for small pipe.
12. Pipe that is less than one eighth inch O.D. shall be clearly labeled as such.
13. All pipe closers are to be open at one end.
14. All pipe fittings are to be made of the same stuff as the pipe they are put on.
15. No fittings are to be put on the pipe unless specified. If you do, straight pipe becomes crooked pipe.
16. Fittings come in all sorts of sizes and shapes. Be sure to specify the direction you are going when ordering.
17. Fittings come bolted, welded or screwed. They are the best.
18. Flanges must be used on all pipe. Flanges must have holes for the bolts quite separate from the big hole in the middle.
19. If flanges are to blank or blind, the big hole in the middle must be filled with metal.



