Kitchen Update
Jim Shaver - Oakville, Ont
>Well in the continuing saga of my kitchen renovation I am now almost half way through my list of things to do. I am working in concert with a contractor and between the two of us we keep moving the rock forward.
Since I last posted a few new mile stones have been completed, the ceramic floor is in, wow what a difference that made.
Also all the electrical and plumbing changes that are required are done. I also completed two base cabinets. The configuration of the room does not allow for much latitude in design so I am keeping the same lay out with some modifucations. The biggest change so far was installing a blind cabinet hardware kit from Lee Valley.
It opens and allows a trailing set of wire shelves to follow and have full access to. I will say I recommend installing this when the cebinet is not in place and with out a counter top, it was a smooth assembly, but doing it in the dark in the corner in place might just kill you!
The crown is going up and the cabinets are almost all in place now.
Plywood counter goes on tomorrow and my granite guy will be here to measure on Saturday.
Hope you are enjoying this, now where is the Advil..
Take care,
Jim