Re: One last word....
Fred Davis
>Barry ,
the problem you describe is a not uncommon occurrence around here in Dickinson county , Kansas and the fix for years has been the same whether it was a basement repair company or a farmer, they all do the same and it works.
You are seem to be familiar with it to the point of running steel rods through the wall to a trench outside . We use a trencher here to cut a slit trench about ten feet from the wall and parallel to it and drop in two foot long steel plates about a 1/2' or so thick , (depends on the farmers iron pile for size) slit a trench back to the wall every four feet or so and drop in a heavy steel rod threaded on both ends , run though the wall and nutted on the trench end outside.
Plate the inside same as the outside and draw up slack until your plumb and straight.
If you have used a trencher , you should have no problem with loose fill as Galen said. This approach seems to work with less work and expense then any temporary shoring done on the inside.
Though you may be familiar with techniques, you never know until you have done it how much work your looking at.
It doesn't cost anything to get a basement repair guy to check it out for you , you don't need a Hydraulic engineer, Hydrologist, etc. , it's all grunt work.
BTW if your block is hollow and not grouted , when you get it straight, see if you can pour grout into the block cavities.
Well worth the effort.
FredD