Re: pay the man is the correct way
Fred Davis
>Well Galen ,
I will have to disagree with some of your assumptions regarding Architects and building codes.
Architects , especially ones who have never done hands on work in the building trades are not qualified to certify spans and stress and strains. That's why you see building departments requiring a Structural Engineer's stamp on the approved plans, it's his license on the line , not the Architects.
Any building contractor or Carpenter who works as a layout man will tell you the first thing they do with a Architect designed building is check the inside dimensions against the outside dimensions , All have seen many times that the drawn floor plan was wider inside , then outside.
I have on many occasions working as a construction superintendent or the General Contractor have had to call the Designers office to tell them of discrepancies in the plan and they send out a rep who is still learning as a rule , not the guy who's name is on the plan and he after looking at say, a bathroom with 55 inch interior width and a 60 inch long standard tub laid from wall to wall tells me , you figure it out and we will send a addendum approval for the change in plans.
2. As for building codes , it is always good to remember they are a minimum set of requirements.
3. As I have stated before , the difference between a 1"1/2 unbonded subfloor overlayed with a unbonded 3/4" finish floor is not any stronger , nor as strong as the 1"1/2 subfloor by it's self.
When you bond the two together , then you have a sandwich equal to a 2 1/4 inch thick floor acting as one. This should be relatively easy to see for nearly anyone and is considered good construction practice and is required in many jurisdictions.
One last tip to the uninitiated , if your considering a big remodel requiring room additions or roof line changes or a new facade, look for your friendly local "House Designer" who does many more of these types of jobs then a AIA registered Architect and is much cheaper and easy to work with and you still need the Structural engineers stamp if it goes beyond replacement of already existing structure .
FredD