Another 3/4" Wood Flooring Question
Ken Bellock (Houston, TX)
>I live in Houston, and down here, most houses are built on concrete pads with no basements. I am having a house built right now, and about a year from now want to install 3/4" hardwood floors on the first floor over the concrete pad. My plan is to put an 8mil plastic vapor barrier over the concrete, then lay a floating layer of 1/2" plywood on top of that leaving 1/4" gaps between the sheets. Then, I plan to put a layer of 15# felt down, followed by another layer of 1/2" plywood laid diagonally to the first layer of plywood and screwed down to the first layer of plywood only. Then I'll install the pre-finished 3/4" flooring directly to that using cleats and PL400.
My questions...
1. Is this a good plan for installing over concrete? I'm worried about moisture coming up from the concrete pad, and do not mind overkill.
2. This makes the total thickness of the floor above the concrete at over 1 3/4" thick. Other areas of the floor will have tile installed directly to the concrete pad. So that's a 1 1/2" rise from the tile to the wood floors. There are several areas where there will be a transition from the tile to the wood, and I'm sure that a transition between the two just isn't going to look very nice, or be very comfortable. Should I remove the tile, and install ply and backer board to bring the re-installed tile up flush to the wood floors?
Thanks for any advice!
Ken