Finishing Schedule of the Completed Clock
George@Colonel's Workshop-Havertown PA
>This is the finished clock showing the waist door open. Charlie finished all exposed and non-exposed exterior facings including the back of the bonnet, bonnet top, waist, and base to the same schedule. First, he sanded the surfaces progressively thru 120, 220, and 340 grits, tacking after each grit thoroughly. Once he was satisfied, he applied black walnut flavored Watco oil by brush and let it stand no more than two minutes before thoroughly wiping it off. He worked individual clock sections, just a few square feet at a time to control penetration. He let the oiled clock sit overnight, and repeated the oil application as before, wiping it off almost immediately. After the second application, the clock "rested" for 72 hours.
Next, he applied two thin coats of Seal Coat dewaxed shellac. After the shellac was completely dry, he mixed BLO and naptha, 50/50 and applied that with 4/0 steel wool, rubbing it in. He removed all residual liquid with a soft cloth, taking care not to leave anything lodged in crevices or corners. The clock was again set aside to dry completely.
Another coat of Seal Coat was applied as before, followed by another application of BLO and Naptha, again rubbed out with 4/0 steel wool. He used wiping poly for six top coats, and the steel wooled BLO/naptha mix was applied after each of them, and after the final top coat.
All the repeated applications provided exceptional depth, smoothness, and mellow glow. The finish must be seen and felt in person to be fully appreciated. Charlie's technique isn't rushed, and requires more patience than I could give it, but his results speak for themselves.
I am developing a Shop Shot and narrative on this project, and should have it to David as soon as I can get the some of the pix down sized.
George
