Re: Hardwood Flooring questions
Fred Davis
>JohnT,
Regarding your flooring project, I read the many replies you got and thought one more wouldn't hurt since that is a job I have done scores of times in forty years of carpenter work.
You may not have heard all of this before , but trust me , it works, saves money, makes your wife think your a hero and the neighbors green with envy.
Since I read your going with Oak or Ash, and you are living with the work in progress , buy 3/4" V-grooved , end matched material that is prefinished or you go with a finish that is easy to repair.
That let's out all water based finishes, poly's and really only two live up to that standard of easy application and ease of repair.
A old line Swedish brand by the name of Glitza which requires their special primer coat to not void the garantee, this is a good product and spray cans of the finish are available for touch up of high traffic areas.
Because I have had to repair finish many times over the years, I prefer the oldest of all hardwood floor film finish which is shellac.
A novice can put it down with a six inch brush that will flow out flat and smooth the first time they try it. Repair of scratches only requires a brush stroke of shellac after a light hand sanding.
Drying time is the fastest by far of all the floor finishes.
I prefer glueing the boards down with PL 400 or 500 brand of construction glue which comes in quart size caulk tubes.
This only requires a blindnail ( I use a Sennco k model 1 1/4" narrow crown staple to hold the board in place until the glue dries.
The term blindnail refers to the practice of toenailing at a 45 degree angle above the tongue and below the top of the board so no fastners shows. This method forms a membrane with the subfloor and if the subfloor was glued down also , makes the floor system extremely strong.
This method also eliminates squeaks , it will bridge a gap up 3/8" of a inch , so the low spots in your subfloor caused by the lightweight 3/4" subfloor material used to span the distance between joists will not be a problem, later on.
BTW all nailed flooring sooner or later squeakes when you walk on it, can't be avoided regardless of the number of fastners used.
Fasten the first course of floor with very few face nails or staples in this case and a squiggle of glue down the bottom of the board and let it dry for 30 minutes and then have your helper lay out the boards ahead of you so you avoid adjacent joints, too many of the same length in one area and so on.
Before you start laying the floor allow 1/32" of side clearence to the walls paralell to the flooring for every foot of width of the room,then divide that number by two and leave that amount between your first course and the sole plate of the wall.
If your lucky the 1/2" of sheetrock will hide the gap and certainly the base will. B
Because the glue needs to stick to the subfloor, no paper is required or needed over the subfloor.
You need any more help , let me know.
FredD