Hiring a contractor - ADVICE

Posts

Hiring a contractor - ADVICE

#1

Hiring a contractor - ADVICE

Rick Snyder

>Hello,

I'm at the point of hiring a contractor to build my workshop.I would appreciate any advice/tips/little details in going through this process and dealing with a contractor on a daily bases.

I've been watching "Holmes on Homes" show on The Discovery Channel and its a real eye-opener to say the least!

Thanks for any help,

Rick Snyder

Re: Hiring a contractor - ADVICE

#2

Re: Hiring a contractor - ADVICE

Chuck in ND

>Your local lumber yard should be able to point you to some reputable contractors.

Re: Hiring a contractor - ADVICE

#3

Re: Hiring a contractor - ADVICE

Thomas Skaggs, Foothills of Mount Level

>Documentation is important. Do you have drafted plans? You need some sort of plans that detail what you want built. Some lumber/building suppliers might be able to help, including engineering trusses if need be.

Create a list detailing what is expected in the final product including schedule of windows and doors, materials desired, finishes etc. Make sure that list is incorporated in the contract you sign with your contractor so that there is no mis-communication up front.

Tom

Re: Hiring a contractor - ADVICE

#4

Re: Hiring a contractor - ADVICE

steve mackay

>I like Mike too ! From his advice and what I've seen here in El Paso ( LOTS of REALLY bad contractors ! ) The biggest thing is to, not only get referances, but to go see their work and talk to the clients.

Re: Hiring a contractor - ADVICE

#5

Re: Hiring a contractor - ADVICE

Neal in San Jose

>You've gotten some good advice so far. I had my own contracting company for 13 years, and from that point of view would like to add a couple of points.

Get three bids minimum. I can tell you it is easy to overlook things when getting the costs together, so challenge any contractor that has a very high or very low bid. The low bidder may have missed something, or the high bidder may have thought of something everybody else missed. I've been in both situations at different times.

Absolutely check out their references, license, and insurance. Check with the State license bureau, BBB and all of the references you can find. A reputable contractor will have no problem with this; be very suspect of anyone that hesitates giving you references.

Double or triple check all documentation they give you. The two most expensive words in contracting: "Change Order"! I've known contractors that intentionally left things out so they had a low bid to get the job, and planned on making all of their money on change orders.

Re: Hiring a contractor - ADVICE

#6

Do Not Pay...

Pat Evans

>upfront that is. If a contractor insists on upfront payment before any work is done, forget him. Pay a contractor for work in place, materials delivered (with proof of his payment), and a reasonable percentage of his profit. That is fair to you both.

Re: Hiring a contractor - ADVICE

#8

Also, be wary

Bruce, a MN Galoot

>of where the contractors are getting their supplies. There are a couple big boxes here that have absolute crap for lumber and I wouldn't allow it on the place. It's not much better than firewood. Make sure the contractors are bidding using supplies from a known, good lumber yard.

Bruce

Re: Hiring a contractor - ADVICE

#9

JL

Re: Definite on the "Change Orders"...

JL

>They tend to be very expensive!

Re: Hiring a contractor - ADVICE

#10

Re: Do Not Pay... And Warranties

Thomas Skaggs, Foothills of Mount Level

>Good point. Also, it is common to hold out at least 10% until the work is 100% completed and you have walked through your project and accepted all the work. You need that witheld pay as a motivation to finish that ever stubborn last 5% of the job.

And while you are interviewing contractors and referrences, be sure to check on their policy for fixing warranted work after completion. Askk all the referrences if they had to call the contractor back and what that experience was like.

Tom

Re: Hiring a contractor - ADVICE

#11

Define the scope of work!

Lee Schierer - McKean, PA

>Take the time to write a compete scope of work you expect to have done as part of your job. The next most common words you will hear in any dealing with a contractor are: "That wasn't in my bid" Right after that you will hear the two most expensive words "Change Order".

If you write down everything you want done and give each contractor a copy you will have far less problems and be able compare the quotes apples to apples.

Lee

Re: Hiring a contractor - ADVICE

#12

Re: Hiring a contractor - my experiance

Stuart Johnson

>I am close trashing the whole idea of a new shop. I want to have a 30x40 metal building erected.

1. Five contractors to erect the building contacted: 3 returned calls and one has actually bid the job. No details just a gross amount.

2. Four concrete contractors called: 1 no return call, 2 bid the job within $100 of each other which makes me wonder, again just gross no details, 1 returned the call a week after contact but has failed to show up to see the site.

3. Aerobic septic needs to be changed prior to obtaining a building permit. The company that does our maintenance was suppose to come Friday to inspect the site give an estimate for the changes. So far they are a no show.

I don't know a thing about construction so I must rely on recommendations and online advise. All of the contractors I have contacted have come with high recommendation. Much of the online advise is good but assumes you have some knowledge of the process. Right now I don't have a warm, fuzzy feeling about a new shop.

Re: Hiring a contractor - ADVICE

#13

I've heard of this " change order " . . .

steve mackay

>and know it equals money but never had anyone explain the term. To the complete idiot ( me ) whats it mean ?

Re: Hiring a contractor - ADVICE

#14

Re: Hiring a contractor - ADVICE

John Foster

>As a lumberyard worker I could give some references; ask the yard staff or truckers their opinions when you are out back getting your wood. The office guy have been known to direct customers to some scmuck who is out of work and behind in his account payments in hope that if he gets work that he will pay his bill. (Not at my yard of course).

Re: Hiring a contractor - ADVICE

#15

Re: I've heard of this " change order " . . .

Chuck in ND

>Steve it would be like if the frameing was up and you decided you didn't like the location of where a window was going, it may have looked good on the original plan but for some reason you decided it wasn't going to work and you told them you wanted the opening moved left, right, up, or down, a change order would be written up and you'd be charged for the extra work of moveing the opening.

Re: Hiring a contractor - ADVICE

#16

Re: Do Not Pay...

r payne

>Around here you won't get a contractor without agreeing to pay something upfront, usually 10%, before any work is done or materials ordered. The reliable ones don't expect final payment until final walk through and the customer is satisfied.

In my experience forget the BBB. I've had dealings with them trying to resolve problems and their procedures accually made it in the companies best interest not to settle the problem. I don't know if this varies by state or not. Ripoffreports.com is better geared to getting problems resolved.

In general any refrences you get from them will be customers that have been satisfied with the work done. Good luck getting refrences from customers who had problems.

And having worked construction I've found 90% of contracters give the other 10% a bad name.

Just for the record I hate construction, not the work, dealing with contractors.

ron

Re: Hiring a contractor - ADVICE

#17

Re: Hiring a contractor - ADVICE

Rick Snyder

>Thanks to all you for responding to my question. Great advice!

Thanks,

Rick Snyder

Re: Hiring a contractor - ADVICE

#18

not suprising

Lee Schierer - McKean, PA

>A few years ago we decided to re-side the house, upgrade all the windows and re-shingle the roof. We went to the local "Home Show" and talked with not less than five contractors who were all eager to take our name and number promising to call. We had three that actually called, two that came to the house and one that gave us a bid. This was for $22,000 worth of work.

This past month at work I have sent out 12 RFQ's for the same work. So far two contractors have responded, yet all the papers interviewing contractors say they are laying people off for lack of work. Must be they layed off the estimators first!

Lee

Re: Hiring a contractor - ADVICE

#19

Best thing I've seen so far

Mike Schwing from Md.

>As a credentialed, professional project manager, the scope creation document is the single most important thing mentioned, from my perspective. If everything else were left out, having the scope agreement in place would still allow the project to be completed as spec'd. Maybe not on schedule or cost, but the scope would be there.

Every project should have a charter, a scope, cost, schedule and risk management plans, at a minimum. Treating your workshop as a formalized project will allow you to manage it properly. You can't manage what you don't identify and measure. I have had many people refuse to work with me because they won't document things as I require. I figure I'm weeding out the worst when they balk. You are the project manager, not your contractor.

Re: Hiring a contractor - ADVICE

#20

It can get VERY expensive

Neal in San Jose

>Even seemingly simple changes can be budget breakers. In this example of moving or changing a window, here in earthquake country, the window would have been sized and located to satisfy earthquake code requirements. A change would mean at least a trip back down to the city for a plan review and an addendum to the permit to allow the change. The city charges for that, plus I'd charge for my time to do that. The window may have been a special order and not returnable, so you may pay for two windows even tho you only install one. The framing may be complete and inspected, so you'd pay for the labor and materials to move the opening and a reinspection fee. My profit and overhead would be added to all of that.

Make sure the plans as submitted and approved are EXACTLY what you want.

Re: Hiring a contractor - ADVICE

#21

Jason Roehl in Lafayette, IN

Also...

Jason Roehl in Lafayette, IN

>change orders can not only be budget breakers, but schedule breakers. Let's say instead of moving a window, you don't like the cabinet layout in the kitchen once the cabinets are installed. Most can be re-used, but several new ones have to be ordered. That might take a couple weeks or a month. But that's not where it ends. The countertop guys needed the final cabinet installation to take their measurements so they could order the countertops--now they're pushed back a couple weeks or a month as well.

Being a painter, I see this kind of thing all the time on a job. The client doesn't realize the full impact of their indecisiveness (the snowball effect in the schedule), but the contractor doesn't necessarily properly prepare the client for those impacts, either. The end result is that the client is unhappy with over-budget and over-schedule, while the contractor just wants to be done with the job and collect his money. I've painted many a late night (and even during closings) when everything in the schedule got pushed back except the final deadline.

Jason

Re: Hiring a contractor - ADVICE

#22

Much more . . .

steve mackay

>than I knew about. And very enlightening. I've delt with client changes with my little gig but to me its pretty small, if very frustrating. Now I see how it really DOES have a big impact on everything involved. Thank you.

Re: Hiring a contractor - ADVICE

#23

Jason Roehl in Lafayette, IN

Almost forgot...

Jason Roehl in Lafayette, IN

>...in my example above, the kitchen rearrangement might require a few receptacles or switches to be moved, as well as some re-plumbing (then some drywallers to repair and painters). Not only will that take the extra time of the repair, but you may have to wait for each trade to fit you into THEIR schedule now, as they were probably basically done before the change. So, while each trade's repair may only take a few hours, you may have to wait a week or so for them to get to you--an additional 2-4 weeks. So when I mentioned that it snowballs, I wasn't saying that lightly...

But, I hope your project goes well for you. You'll have to find a good communication balance with your contractor. There's good communication, but then there's pestering that causes him to suddenly always have dead cellphone batteries or is always in another meeting...!

Jason