>I did exactly that 30 some years ago in our first house in Illinois. In my case I planned to use the box housing the existing fuse panel as a large junction box and I installed a new 200A load center in the adjacent stud bay. I then connected a meter socket on the outside of the garage, the vertical service feed conduit, the weather head, and the 3/0 conductors in preparation for ComEd to string the new service from the pole. Imagine my surprise when instead, they just cut the existing line over from the old weather head to the new one.
It seems that they have a lot more flexibility rating wires in free air than we do in conduit or raceways. Of course it could be that oversized wire was strung in the first place when the house had been built 15 years earlier, but that doesn't sound like a developer's practice, does it?
In any event, that was 1974, it was Illinois, it was a particular community in Illinois, so there are a lot of things that may be different there and now. Also, I see you're in Canada—they may not be so considerate of DIYers when it comes to being permitted to roll your own. By all means check and find out. While some may be tempted to undertake in-house wiring without permits, ComEd, and I'm sure most any utility won't begin to cut it over without the imprimatur of the AHJ (authority having jurisdiction). Obviously, I jumped through all the hoops.
Rod