Finishing basement stairs
Mark McC
>I am finishing the basement in our 10 years old house
and have a queation about a rough 2x4 post that is at the very bottom of the basement stairs.
The post is made from two 2x4's barely nailed together and simply toe nailed into the double joists above and the concrete floor with a total of 4 nails.
Is it normal to have a post at the bottom of the stairs for structural support of the floor above? If it is I would think
it would be better built and attached to the floor.
I want to get rid of this post at the bottom and replace it with a newel post, new handrail and ballisters.
My suspcicion is that the post is only there because it was the easiest and cheapest way for the builder to attach the handrail.
Anybody know anything about structure and whether its normal to have a post at the bottom of the basement stairs for structure?
Or how could I find out if it is a necessity
thanks
Mark