>Hi, all,
I've never been sure what to do about the situation I have right now with a client that keeps changing his mind. He wants me to build an 8' base cabinet that will divide his kitchen from the dining room where a wall once stood. He's not married, so no wife to help him make decisions! I've sat down with him four times now and painstakingly gone over the measurements, drawings, materials list, hardware, and the options he has requested. Three to four days later he calls me with a zillion changes, always after I've already ordered the things I thought I was going to need. It's going to cost him a lot of extra money if I have to charge him for the things not used each time he does this. Some of them I might be able to use on other projects, so won't charge him for those, but some things are specially ordered and I'll probably have them in my stock forever, as I can't return them either!
Now for the kicker--from the git-go he stated to me he didn't want to spend a lot of money on this cabinet!
I think my best option now would be to have him sign off on a final plan, to hopefully discourage him from doing this again. Also I think I better redo the original paper estimate I presented to him, with the added charges for the material and hardware I know I'll never use, and an explanation of said charges.
So far I'm still in good standing with this customer, and hope It stays that way, as he's a business owner here in this small town, too.
I thought I'd run this past you guys and ask for your thoughts on the matter. Anything else I should/shouldn't do?
Thanks, fella's!