Posts

Can't Suck Enough?

#1

Can't Suck Enough?

Mark Mandell - Gone Round In Jersey

>Well maybe you can.

Few months ago I converted The Shoebox Woodshop's DC system (8 year old Reliant 820) over to 6" PVC ducting. Since the blower's out in the garage, I had to complete the 6" through the rim joist and then properly pipe the 6" into the blower. I also decided to up-grade to a Process Systems filter bag, and went whole hog with a 6' x 19" bag, and reconstructed the unit by mounting the blower on the wall with a 24" straight run into the impeller plus redid the debre and filter bag location, including a new length of 5" pipe from the impeller to the bag-ring. Just got it finished and tried it out. Dust simply disappears in the chopsaw booth with it's full 6" draw. Same with the table saw getting pulled with a pair of 4" draws over and under. The air blasting through the band saw cabinet is about 3x louder that the saw, and the the noise level at the lathe with two 4" draws has gone up about 30 dB. Have now posted a New Rules sign in the shop that slip-on shoes and loose-fitting clothes are no longer allowed as this thing will suck you out of your scivies!

The system moves so much air that I will have to be careful not to reverse the drafts on the waterheater and the furnaces that are located at one end of the shop. I previously had a make-up air port from the garage to the shop, but had to use that space for other things.

For the graphically inclined, the pix that follow show the new setup, the wall mounting, and the monster filter bag.

mm

Re: Can't Suck Enough?

#2

Set-up

Mark Mandell - Gone Round In Jersey

>This shows the new placement of the components back in the corner of the garage. Bend from the rim joist was done with a pair of 45* to make the effective curve more than a 12" radius.


img

Re: Can't Suck Enough?

#3

Blower Mount

Mark Mandell - Gone Round In Jersey

>Made a new faceplate and 6" intake for the impeller. The last connection is with a 6" Fernco to allow access for clearling clogs.


img

Re: Can't Suck Enough?

#4

Overkill?

Mark Mandell - Gone Round In Jersey

>That was SWEMBO's comment when she saw the new bag installed and inflated.


img

Re: Can't Suck Enough?

#5

swembo?

Carlos Clarke

>Is that She Who Eventually Must Be Obeyed?

Nice system.

Re: Can't Suck Enough?

#6

E-mmediately |;-}}}

Mark Mandell - Gone Round In Jersey

>

Re: Can't Suck Enough?

#7

Re: Can't Suck Enough?

Gary Evans Tallassee, TN

>Hi Mark,

I appreciate this post. I'm working out my system now to use 6" pipe with a similar blower/bag unit. I was trying to figure out how to tie into the horizontal input on the blower without creating a restriction. I hadn't thought about remounting it so that the input is vertical. Good one!

As an aside, where did you get your 6" pipe and fittings. Not much of that available at Home Depot and Lowes around here. Did you use plastic pipe all the way through?

Thanks,

Gary

Re: Can't Suck Enough?

#8

Re: Can't Suck Enough?

Barry Irby

>I'm not Mark, but I built my system out of plastic pipe. I got most of it at Lowes. They had a limited selection of fittings but I was able to cobble together enough stuff to make a system. (HD had much less) Later I found the pipe at a farm supply place for much less, especially the 6". Incidentally, this is all S&D or Sewer and Drain or Schedule 20, I think. Before you buy pipe, look inside it. Much of it was very rough on the inside. I just figured it was better to buy the smooth stuff. Also, Lowes had little filler or adapter rings that would allow you to use regular plumbing fittings in place of the S&D fittings. I found the plumbing fittings to be so much more expensive that I worked around them. For example, I used a Wye and a 45 instead of a swept Tee. Even buying two fittings was substantially cheaper than the one.

Also, Check out Bill Pentz site. There was an article there about making your own fittings. It depends on whether you have time or money, but I might have made some myself if I had realized how relatively easy it is. Seems like an interesting challenge.

Re: Can't Suck Enough?

#9

Re: Not Mark - but

Larry Clinton At Frankfort (Central)., Indiana

>I installed my Grizzly 3 HP Cyclone using S&W pipe. I bought some of the 6" pipe at Lowes, some of the fittings there. I bought some at one of the farm supply stores. I also found some oddballs at one of the local plumbing supply houses - wasn't a whole lot more expensive there. Where possible I bought at Lowes and Menard's as they were cheaper (although limited in variety). As my Cyclone has an 8" inlet, I needed to split it into 2 - 6" for my main runs. I couldn't find any sweep type fittings for the 8" that were reasonably priced (All options I found would have cost over $125 for the fittings to do this). I ended up making that fitting using a short (free scrap from my son's work) piece of 8" pvc, a couple of pieces of 6" pipe and some pvc cement. I can give you more information if you wish on how I made this. It did take some searching to find all the pieces but I saved a lot by buying at the cheapest sites.

Re: Can't Suck Enough?

#10

I'm Mark |;=}}}}}

Mark Mandell - Gone Round In Jersey

>Hehe

Gary,

I bought the 6" pipe at a mason / concrete block supply that carries the PVC/Recycled stock. That is 1/16" white PVC outer shell with a 3/32 black inner layer of recycled plastic that looks like ABS, but isn't. Stuff is well suited to a DSC system and cost me $4 per 10' length. 6" fittings for the S&D grade are still not cheap, but they're way cheaper that Schedule 30 or 40. I bought a bunch of fittings and simply returned what I didn't need. My system comprises a good 60+ foot total run with 2 6" wyes, 2 6" T's, i 6x4x6 wye, 1 6x4x4 wye, and a pantload of 45* bends. All-in-all I've got $200 in the pipe and fittings, The new PSC bag was $100 and the 5" flex was another $40 with shipping from McMaster.

I was concerned about the length of the system and whether I should have used step-down ductwork to improve velocity. However, when I fired the system up I was flat out shocked at the draw through the 6" piping. Having run the system check with the draw from the chop saw which is at the end of the line, I opened the cleanouts and checked the ducts . . . absolutely clean, no chips sitting in the lines. That tells me I'm getting full flow. If I were really into system efficiency ratings and such, I'd work up the static pressure and the velocity, but I don't need to go to all that touble. The thing sucks everything but me and the tools up the pipe. That's good enough for me!!!

|;-}}}}

MM

Re: Can't Suck Enough?

#11

PS

Mark Mandell - Gone Round In Jersey

>Gary,

Whether you mount the blower on the wall as I did, or leave it horizontal, you need to set your piping up so that you've got a straight run to the intake that's at least as long as 3 times the diameter of your inlet. This smooths out the turbulance in the line to allow your impeller to get its maximum bit on the air-flow. It would be better not to have the Fernco connection for a smoother flow, but I had no choice since I needed a way to access the impeller in case it go overloaded as can happen with lathe shavings.

BTW Do not glue your pipe and fittings together. Instead, tap them home and tight and then use either a bead of caulk at the edge of the fitting and duct tape to seal the joint. This will help you if you have have to get access to clear a clog.

Speaking of clogs, I must start keeping the cats out of the shop. |;-}}}}}

Re: Can't Suck Enough?

#12

Re:"or"

Mark Mandell - Gone Round In Jersey

>duct tape. You don't need both

|;-}

mm

Re: Can't Suck Enough?

#13

Re: Can't Suck Enough?

Gary Evans Tallassee, TN

>Thanks everybody,

I appreciate the comments. I guess I just need to get out and see what I can find in the way of pipe.

My system will be about 30' long with the DC sitting dead center. I figure that way I can use a blast gate on either branch to reduce the actual length that the blower is sucking on to 15' or so. That should help compensate for the fact that my blower is marginal for this setup. My two big chip producers, the planer and the lathe, will each be at the end of one of the two runs, with my other tools dropping in along the way.

The reason I like turning the blower intake vertical is that I am doing this in the basement under the shop. I will have two ~5' long drops coming straight into a wye at the blower. Shouldn't be a lot of turbulence in that kind of setup. Only problem is I don't think I have enough headroom for that big dust bag. What a monster.

Gary

Re: Can't Suck Enough?

#14

Why?

Mark Mandell - Gone Round In Jersey

>Gary, you should not have a wye "at the blower." Your run into the impeller should be a straight shot. Having a wye at the blower will create the very turbulance you're trying to avoid. Since you said you're bringing in two branches, you should tie them into the vertical at least 24-36" above the blower port.

Have you made a 6" blower port? Most of these things (Asian DC blowers) are set up with a 5" port that they then split to two 4" take-offs with a plastic fork. As you see from mine, I made a new cover plate and 6" port for the intake. BTW, I left the 5" exhaust piping because I wanted to create some back pressure against the motor. If I had converted the bag connection to 6", there'd be danger that I'd overdraw the motor amps and burn it out.

mm

Re: Can't Suck Enough?

#15

Don't Use Duct Tape...

Garrett in Victoria

>It actually performs very poorly on ducts. The fabric has a tendency to unpeel and leave a sticky mess. Instead, buy a big roll of the metal tape - not the kind with the threads through it and the brown paper backing which is also a PITA. The pure metal tape with white paper peel-off is easy to use, clean, adheres well, and can be peeled/scraped off when you inevitably change your shop layout and have to reconfigure your ducting.

There are at least five good descriptions with extensive photos of installations including two on PVC versus metal ducting in the WC Articles and Reviews Department by Bill Pentz, Rod Cole, Steve Silca, Terry Hatfield, and, of course, yours truly. Scroll down to the the Shop Topics Section or search on our names.

Cheers, Garrett

Re: Can't Suck Enough?

#16

I meant . . .

Mark Mandell - Gone Round In Jersey

>Aluminum duct tape. Even the top-grade of fabric tape will dry out in a few years. The aluminum, designed for cold-air A/C ductwork, will be much better. HD and Lowes carry the thinner stuff (2 or 3 mil), while a good HVAC supply house with have the heavier stuff.

Thanks for the get, Garrett. I should have been more clear.

mm

Re: Can't Suck Enough?

#17

Re: I meant . . .

Rob Stokes in North Vancouver

>The foil tape works, but better yet and if the install is to be at all permanent is a brush-on duct sealer.

If you use adjustable elbows, don't forget to seal each one of the swivel joints. They don't leak much, but they all leak a little bit and it adds up in a hurry.

Rob

Re: Can't Suck Enough?

#18

Re: Not Mark - but

Curtis Gray

>Larry,

I am in need of the same step down from an 8 inch inlet to split to 2 6 inch portions for my main. Could you please post additional information? Thanks.

Re: Can't Suck Enough?

#19

Re: Info for Curtis making an 8 X 6 X6 fitting

Larry Clinton At Frankfort (Central)., Indiana

>Curtis, I am attaching some pictures to show how I made the fitting. I used about a 3 foot section of regular 8" pvc (son got it free - scrap from his work). I attached a section of S&W 6" by cutting out a hole in the 8". I started by holding the 6" on top of the 8" at 30 - 45 deg, then marking out an approximate opening by using a straight edge held against the 6" and extending it down to the 8". This gave me enough for a starting hole. I cut the hole (undersized) with a saber saw. Then I gradually enlarged it using a variety of tools (air router, air tool grinder with a drum sander (very course grit) etc. After I enlarged it enough to insert the 6" I pushed it in marked it and cut it at the right angle. I glued the pipes together. Then using some of the ground up plastic from my hole grinding and PVC cement, made a thick slurry and filled all the gaps in the joint. I then ground the inside of the joint smooth with the drum sander and air tool. I reduced the end of the 8" by cutting some narrow rings - about 3" wide from the ends of the 8" and 6" pipes. I split them, heated them to (as I remember about 140 deg. in SWMBO's oven. They get real soft. I inserted them into the 8" making a stepped transition. I think I had to use 1 ring from the 6 to get the right thickness to fit the ID correctly. I will attach pics below.

Re: Can't Suck Enough?

#20

Re:Picture of completed fitting installed

Larry Clinton At Frankfort (Central)., Indiana

>The pic shows the fitting installed into the dust collector.


img

Re: Can't Suck Enough?

#21

Re: Picture of 6" fitted into 8" pvc

Larry Clinton At Frankfort (Central)., Indiana

>The attached shows the 6 & 8" pipe joint with the "slurry" filling the joint.


img

Re: Can't Suck Enough?

#22

Re:Picture of "rings" reducing 8" to 6" pvc

Larry Clinton At Frankfort (Central)., Indiana

>This shows the "rings" fitted into the 8" to reduce it to accept the 6" pvc. I did use the air grinder/drum sander to make the fitting very close. Didn't require any "Slurry" to fill any gaps. Note: it is fairly easy to cut the split rings to length so the ends but very close while the material is hot. It is very rubbery at 140 deg or so - won't even support its own weight.


img

Re: Can't Suck Enough?

#23

Re: Reduction fittings vs. bushings

Mark Mandell - Gone Round In Jersey

>Larry,

From the previous posts, I thought you were using heat to remold the pipe into a smaller diameter, without cutting it, into reduction fittings. What you pic shows are shop-made bushings. I make those without heat by just cutting a 1/2" section out of a short piece of pipe and then cementing it in place. When more than one is needed I cut a bit more out of the next one and glue it inside with the split at 90* to the first. What's the advantage of the heat treating over what I do?

I seem to remember running across a computer program for cutting those branch pipe joints that was pretty nifty. Just have to remember where . . .

mm

Re: Can't Suck Enough?

#24

Re: Reduction fittings vs. bushings

Larry Clinton At Frankfort (Central)., Indiana

>The 8" pipe I used was "thick wall". The rings I cut from the pipe were pretty rigid. By heating them, It was real easy to form them and trim to the right length. Just took a few minutes. The final reduction ring was made from 2 sections of the 6", I had to split them and remove part of the rings to make the last reduction as I needed thinner material. I did look into "forming" the pipe, but when I investigated, most had packed the pipe with hot sand, and used additional heat to make the pipe malleable. Still would have had to make some kind of jig to properly size the ends. I finished my fitting in one day and had it installed without much fuss.

Re: Can't Suck Enough?

#25

Gotcha

Mark Mandell - Gone Round In Jersey

>I didn't think that PVC would act like heat-shrink so I was wondering how you were dropping 2" in dismeter without removing material.

Would be pretty easy to make up the forms to do a fitting by way of resin/cloth lay-up, but that's more than a bit of overkill just to get a shaped reduction fitting. |;-}}}

mm