Home Articles Forums Gallery Marketplace Videos

WoodCentral Forums

Knowledge You Can Build On — Est. 1998

REAL MILK PAINT

OT Patching Asphalt Drive?

Posts

OT Patching Asphalt Drive?

#1

OT Patching Asphalt Drive?

Barry Irby

>I have been working on a rental property and want to patch the asphalt drive. There is a cracked depression about three by four feet. A puddle stands in it every time it rains.

Can I buy bags of asphalt at the Borg and fill it in? Do I have to remove the existing asphalt first? Can somebody walk me through this or is this best left to the pro's?

Re: OT Patching Asphalt Drive?

#2

Re: OT Patching Asphalt Drive?

Kneale Brownson in Northern MI

>There's a liquid product the gummament asphalt patchers and asphalt paving companies apply to prepare for skin patching, which is the process you'd use as opposed to removing old and replacing. Can't recall its real name, but it's the emulsion stuff used to create asphalt. Real sticky stuff that works like glue. I've heard of folks buying small quantities from asphalt batch companies. You also sometimes can buy something like a (metal) trashcan full of hot asphalt mix. You want the fine agregate version, not big chunks. Throw some blankets around it and it'll stay hot quite a while. Asphalt patching works best if you use the glue and hot mix. Clean the depression well (a powerful leaf blower works well), spread the glue, dump in the hot mix and use a dirt tamper to compress it.

Re: OT Patching Asphalt Drive?

#3

how to Patch an Asphalt Drive

Ian (in Sydney, Australia)

>the "proper" way is to use bitumen emulsion (sometimes sold as bitument waterproofing paint) and a product known here in Australia as "cold mix"

cold mix is a mixture of fine aggregate and bitumen emulsion which you should be able to buy at the borg � it may even be called asphalt!

step 1, clean the surface � air from a compressor works best

step 2, fill the cracks with a little bitumen emulsion, wait for it to "break" � the water in the emulsion evaporates and it goes sticky (for want of a better word) � then add fine sand

step 3, paint the area to be patched with bitumen emulsion, you want to use about a litre per square metre (sorry about the metric), again wait for it to break then spread the "cold mix" slightly above the finished level

step 4, compact the cold mix. A trench or plate tamper is best for this

step 5, spread fine sand over the patch so the next vehicle doesn't pull out your patch

you should be done

Re: OT Patching Asphalt Drive?

#4

Prep work and base material is the key.....

Scott in Eastern Iowa

>.....to success in any pavement project. Dont just cut out the 3'x4' area and fill it in with new materials, your success rate will be <50%.

To lock the new asphalt material in, simply dig under each 3' and 4' side a good 6" or so. Add some good base material to the entire bottom if it was disturbed and compact it well.

By digging under the sides and filling it with the new asphalt, your essentially locking it into place so it has little chance of heaving upwards.

Re: OT Patching Asphalt Drive?

#5

My asphalt guy won't do a cold patch that big

nailshooter

>Barry - When you do a cold patch, it will never be as hard as a hot patch or hot application that is rolled out. You cannot get the compression, and you are using more of an aggregate-with-adhesive system. You are literally waiting for your mix to air harden.

The cold stuff is great for pot holes, and even some larger patches if you have access to a small roller or compactor. I have had no luck at all fixing a hole that large with cold materials, especially if the area will receive a fair amount of traffic.

When we fix a hole that big, we saw the edges smooth back to hard asphalt. A ragged edge will not get a good bond with the new stuff and will break off. We then call one of the companies that sells hot asphalt and run a truck over and get what we need. After removing all loose debris (with a blower) and priming the area, we broadcast the hot mix (use the smaller "D" type) in and tamp it with a roller/compactor.

If we are in an outlying area away from our supplier and hot mix isn't practical for a small job, we do everything but get the hot mix. With the hole prepped, we mix up 2500 lb sackcrete, add black dye to it, and pour it. Use a piece of mesh (#6 EWWM, same as for sidewalks) in your patch, sitting in the middle of your concrete. Finish the concrete fairly smooth and then scratch the surface before concrete is dry with a broom for a medium/heavy finish on the concrete.

If it is just you doing the work, the colored concrete would be my choice. You can mix it in a wheelbarrow next to the patch and dump it in and smooth with a 2X4 screeding with the edges of the hole as your guide to proper finsh heigth.

Robert