>A lot of good advice already. I put down 1300 sq. ft. of Quickstep last year. It took a couple of months to do all of it, but I live alone and there wasn't a huge hurry. Large areas go quickly. Smaller areas require lots of cuts, which chew up time. Having a helper can really speed things up! On some smaller areas, I found I spent more time walking back and forth to the saw to make cuts than I did installing the floor! I bought a Delta TwinLaser 12" miter saw and was darn glad to have it around for this project. Replacing trim and molding probably took as long as the rest of the flooring job...
I undercut door jambs using a Japanese-style pull saw. It worked well, but took a surprising amount of time. And I had a lot of doors to deal with. If I'd known at the beginning of the project that a Bosch 1640VS jamb saw was only $99, I would have purchased one and saved myself a lot of time!
I went with a combo vapor barrier plus foam padding on the advice of my salesman. Wish I hadn't. The vapor barrier needs to run up the wall a couple of inches, which is easy if you're using 6mil plastic, but difficult if it has a layer of foam padding attached. If I had to do it over again, I'd go with separate vapor barrier and foam. Perhaps a bit more work to put down, but it would make putting the trim back in place much easier.
The QuickStep I used had a click-together joint, which seemed to work very well. A metal pull bar is definitely a requirement. I had to do a bit of tapping, but not too much. I found a white rubber mallet that seemed to work pretty well for tapping on the pull bar. The black mallet I started with had a bad habit of marring the floor given half a chance. Not permanently, but cleaning up the marks took time. The edges of the flooring are fragile. If you're having a tough time getting a piece in, don't continue to hammer in the same spot over and over. You'll eventually damage the edge and the joint will never seat properly.
Prepping a room is important! The floor really does need to be very clean and flat. Not necessarily level, but flat. I had a nail embeded in my slab foundation at one doorway. There was so little of it protruding that I couldn't get a decent grip to pull it out. Figured that it wasn't much taller than the foam, so it probably wouldn't be noticed. Wrong! Every time I step on that particular board I can feel that nail. Should have pulled out the grinder and made it perfectly flat...
Think about layout and transitions from one room to the next before you start. At the edges of your room, you may have to make cuts along the length of the board to get the last piece to fit. The smaller these pieces are, the more problematic it will be to make the cuts and get the board in place. I tried both a rail-guided circular saw and a jigsaw for making these long cuts. In my older home, the rooms often weren't square which ruled out using the table saw for many of the cuts. I found the jigsaw a bit easier to use, but only because I didn't have a decent cutting setup for the circular saw. A fine-tooth blade will help to avoid chips on the surface of the laminate. If you place T-molding transitions at room boundaries, you may have more choices in how you lay the boards down, which in turn could prevent you from having to try to slide a 1-2" sliver in to finish off the edge of the room.
Finally, you'll need to figure out how big of a gap to leave around the edges of the room, so the floor can "float". My salesman confidently told me to leave a 1/4" gap... but the installation directions for my floor suggested that 3/8" was more appropriate for my install. I haven't noticed much expansion during the last 6 months, but the humidity in my area is pretty consistent. I have a buddy who installs flooring in Texas and he has some horror stories to tell about people who didn't allow the flooring to acclimate, left too little gap, and then had the entire floor start to buckle!