Messages

Subject:
Re: OT- Electric meter base replacement?

Walter Ahlgrim
Many utilities refuse to connect unless it was installed by a pro as they are betting there live on your work. If there is a short the guy installing the meter is likely to be engulfed in a plasma fire.
Before you buy a base make sure it is on the list of current approved models from your utility.
It is no fun redoing it.

Walta

© 1998 - 2017 by Ellis Walentine. All rights reserved.
No parts of this web site may be reproduced in any form or by
any means without the written permission of the publisher.

WOODCENTRAL, P.O. BOX 493, SPRINGTOWN, PA 18081